← All writing
Trades
Jan 20265 min readBy Linnea Carrick

A septic handoff is mostly a phone call to a daughter-in-law

Septic disclosure is the rare handoff that survives a sale. But the disclosure only carries what the original installer remembered to put in writing.

ost of the handoffs in this craft go to the next owner. The table's second owner. The unit's next tenant. These handoffs are soft — they happen because the original owner volunteers information at the time of sale, or because the maker has slipped a folded note into the drawer. They fail more often than they succeed. A septic tank is the rare exception. Most jurisdictions require a real-estate disclosure at closing that includes the location and last-pumped date of the septic system. So the septic handoff is the closest thing we have to a guaranteed transfer.

What a septic disclosure actually transmits

isclosure is a legal document, signed by the seller at the closing of a property sale, that names — in plain language — the components of a septic system, their last-known service date, and any limitations the seller has personally observed. In good jurisdictions, disclosure also names the installer and the model of the tank and the drain field. In weak jurisdictions, disclosure is two lines and a checkbox.

The handoff from a septic installer to a property buyer at closing is roughly the same thing as the handoff from a refrigeration installer to a grocery-store general manager at a warranty transition. The owner on paper does not necessarily know anything about the system. The owner on paper inherited what the previous owner left in writing.

Septic disclosure is the closest we have to a guaranteed transfer. Most handoffs fail more often than they succeed.

Where the handoff fails even when disclosure holds

have seen two failures persist even in jurisdictions with full disclosure. The first: the disclosure lists the last-pumped date but does not list the installed-tank volume. A new owner's pumper comes out and assumes the tank is one of the standard sizes, hooks up a small vacuum truck, runs out of room before draining the tank, comes back the next day. That is a service call the disclosure could have prevented if it had carried a tank volume.

The second: the disclosure lists the installer and the installer's contact number. The installer's contact number has been disconnected for six years. The installer retired. The new owner calls the number, gets nothing. They can probably still reach the installer through the installer's daughter-in-law, who still answers the phone, but only the people who grew up in that small town know that. An online search engine does not know that.

What a trades-side care record adds

trades-side care record on a septic install could keep ten lines of technical information stable across a sale: install date, install crew, tank volume, drain-field location sketch, last-pumped date and crew, last-inspected date and inspector, baffle material of record, riser height to grade, installer contact if the installer is reachable, fallback contact if the installer is not. Two printable items on a 2×2-inch QR: the tank volume, the drain-field sketch. The rest lives on the scan-side.

None of this is technically hard. What is hard is getting the install crew to fill it in once. Most install crews will. The resistance is the install crews' habit of thinking the disclosure is where the record lives. The disclosure is what stays in a folder at the county clerk's office. The disclosure is not what the pumper looks at on a Sunday call-out. The pumper looks at the QR.

A small experiment

ne installer I have spoken with — a four-person shop that does about eighty residential septic installs a year — has started writing the care record alongside the disclosure. Every install gets a Makerstead entry on the day the crew backfills. The care record consists of the eleven fields above plus a single photo of the riser at grade. The QR is delivered with the disclosure. About a quarter of the new owners phone the installer within thirty days of closing to ask a clarifying question; that rate doubled once the care record existed.

The installer is still doing the same number of installs a year. The installer is doing half as many callbacks for clarification. The installer is losing three or four jobs a year to a successor shop whose marketing is more visible. The installer is finding eight or nine jobs a year coming back through the care record after the house has changed hands twice.

What does this say about trades-side care generally

f the only system of record we can rely on is the disclosure at closing, then trades-side care pages are going to be a phone-call to the installer's daughter-in-law — for as long as she's answering. If we can move the record from disclosure-paper to QR-on-riser, then the installer's customer reappears in the installer's customer list. The installer's customer — the actual, current, paying customer — gets the pumper out to the system without ordering the wrong vacuum truck.

We are not competing with disclosure. We are an additional layer across the next installer, the next owner, the next operator, the next pumper. The same way a furniture maker's spec card lives in the drawer of the second owner, a septic install spec card lives in the QR on the riser of the next owner.